STOCK CODE SZ000400

Energy Storage and New Energy

‌XJ’s energy storage and new energy products have delivered over 8GW of capacity and deployed nearly 300 energy storage power stations, covering power generation, grid integration, load management, and frequency regulation sectors.

MAIN SOLUTIONS

Solution 01

Behind-the-meter Energy Storage Solution

Balancing electricity load through ‌peak-valley electricity price arbitrage‌, or serving as a ‌backup power source‌.
Solution 02

‌T&D-side Energy Storage Solution

Directly deployed in transmission or distribution networks to regulate frequency and voltage, alleviate line congestion, and enhance grid resilience.
Solution 03

Generation-side Energy Storage Solution

Deployed directly alongside power generation facilities (such as wind farms, PV plants, and thermal power plants) to mitigate generation fluctuations and improve grid stability.

MAIN PRODUCTS

MAIN CASES

100MW/200MWh Energy Storage Station in Jianghua, Hunan Province, China

The project adopts LFP battery containerized systems with liquid cooling and fire protection technologies, supporting peak shaving, frequency regulation, and renewable energy integration. It can discharge 200MWh daily, and reduce CO2 emissions by 86,900 tons annually.

COD time:
2023-06
Capacity:
100MW/200MWh

BYD 150MW/600MWh Energy Storage Project in Fukang, Xinjiang Province, China

The LFP battery energy storage system enhances grid peak-shaving capacity and supports renewable energy integration. The project generates 1.22 billion kWh annually,  while reducing CO₂ emissions by approximately 870,000 tons per year.

COD time:
2023-11
Capacity:
150MW/600MWh

605MW/1410MWh Energy Storage Project in Dengkou, Inner Mongolia Province, China

The hybrid energy storage system combining "100MW/400MWh VRB + 505MW/1010MWh LFP battery" balances frequency regulation response speed and long-duration energy storage needs, while adapting to extreme climatic conditions in desert regions.

COD time:
2025-04
Capacity:
605MW/1410MWh

Yangluo Thermal Power Plant in Wuhan, Hubei Province, China

As the first "supercapacitor + LFP battery" hybrid energy storage frequency regulation project in Central China, effectively supporting grid stability and new energy integration.

COD time:
2025-04

100MW∕200MWh Energy Storage Station in Shizhu, Chongqing, China

It is designed to provide peak shaving, frequency regulation, and capacity leasing services for multiple renewable energy plants, enhancing grid flexibility and regional renewable integration.

COD time:
2024-07
Capacity:
100MW∕200MWh

50MW/50MWh Energy Storage Project in Yongji, Shanxi Province, China

China's first 100MW hybrid energy storage frequency regulation project integrates flywheel energy storage with LFP batteries. It significantly enhances regional power system stability and renewable energy integration capabilities.

COD time:
2024-10
Capacity:
50MW/50MWh

100MW/200MWh Energy Storage Station in Jianghua, Hunan Province, China

The project adopts LFP battery containerized systems with liquid cooling and fire protection technologies, supporting peak shaving, frequency regulation, and renewable energy integration. It can discharge 200MWh daily, and reduce CO2 emissions by 86,900 tons annually.

COD time:
2023-06
Capacity:
100MW/200MWh

BYD 150MW/600MWh Energy Storage Project in Fukang, Xinjiang Province, China

The LFP battery energy storage system enhances grid peak-shaving capacity and supports renewable energy integration. The project generates 1.22 billion kWh annually,  while reducing CO₂ emissions by approximately 870,000 tons per year.

COD time:
2023-11
Capacity:
150MW/600MWh

605MW/1410MWh Energy Storage Project in Dengkou, Inner Mongolia Province, China

The hybrid energy storage system combining "100MW/400MWh VRB + 505MW/1010MWh LFP battery" balances frequency regulation response speed and long-duration energy storage needs, while adapting to extreme climatic conditions in desert regions.

COD time:
2025-04
Capacity:
605MW/1410MWh

Yangluo Thermal Power Plant in Wuhan, Hubei Province, China

As the first "supercapacitor + LFP battery" hybrid energy storage frequency regulation project in Central China, effectively supporting grid stability and new energy integration.

COD time:
2025-04

100MW∕200MWh Energy Storage Station in Shizhu, Chongqing, China

It is designed to provide peak shaving, frequency regulation, and capacity leasing services for multiple renewable energy plants, enhancing grid flexibility and regional renewable integration.

COD time:
2024-07
Capacity:
100MW∕200MWh

50MW/50MWh Energy Storage Project in Yongji, Shanxi Province, China

China's first 100MW hybrid energy storage frequency regulation project integrates flywheel energy storage with LFP batteries. It significantly enhances regional power system stability and renewable energy integration capabilities.

COD time:
2024-10
Capacity:
50MW/50MWh
400-01-95598
overseas.sales@xj.cee-group.cn
No. 1298, Xuji Ave., Xuchang, Henan, P.R.China
Copyright XJ ELECTRIC CO..LTDHenan ICP registry No. 2022005074-2 Henan PNS registry No.41100202000889